The Forrestfield-Airport Link (FAL) project will deliver an 8.5 km extension of the existing PTA urban rail network in Perth, Western Australia connecting the Midland Line, just past Bayswater Station, to Forrestfield, running underground in twin bored tunnels underneath the Swan River, Tonkin Highway and Perth Airport. The project will include three new stations, being: Redcliffe Station (located underground in Redcliffe), Airport Central Station (located underground at Perth Airport to service both domestic and international terminals) and Forrestfield Station. The project will provide new rail services allowing a 20-minute rail journey from Forrestfield Station to the Perth CBD, improved bus networks for the eastern suburbs, foothills and surrounding communities as well as integration with the full Transperth bus and train network. Redcliffe Station and Forrestfield Station will have rail-bus interchanges and up to 2,500 new car parking bays in total. Description of Geomotion Works Salini Impregilo S.p.A. - NRW Pty Ltd Joint Venture (SI- NRW JV) has entered into an agreement with Field Monitoring Services, Geomotion Australia, Land Surveys Joint Venture (FGLS JV) for the work of: “SUPPLY, INSTALLATION, TESTING, OPERATION, MAINTENANCE OF GEOTECHNICAL AND SURVEY INSTRUMENTATION, INCLUSIVE OF MONITORING AND MIMS MANAGEMENT FOR FORRESTFIELD AIRPORT LINK PROJECT”. Geomotion is working as a part of Joint Venture partner and broadly responsible for the followings works:
1 Comment
A NSW goldmine forced to shut down for three months last year after an earthquake has again halted operations following a dam wall breach.
The wall of a tailings dam at the Cadia mine, about 20km south of Orange, partially collapsed on Friday after there were two magnitude 2.7 earthquakes in the region on Thursday. Its operator Newcrest Mining says there is no threat to personal safety and it has secured the area around the dam. A "comprehensive geotechnical monitoring system" was implemented, the company said on Saturday. The material involved, which was contained within the southern dam, was described as "a slurry of finely ground rock, water and a low level of benign processing re-agents". The mine was forced to shut down after it was hit by a magnitude 4.3 earthquake in April 2017 and didn't return to partial production until July, causing a huge hit to the company's first-half profit. Source: The West Australian (AAP) |
Categories
All
Archives
July 2020
|
SERVICES |
COMPANY |
|